Datacenter Construction

Building the foundation for the future of digital assets and AI. We specialize in constructing high-performance ASIC mining and AI data centers across the UAE.

Expertise

ASIC Mining & AI Data Centers

Segments provides end-to-end construction services tailored for the unique power and cooling demands of cryptocurrency mining and artificial intelligence operations. Whether you need a high-density air-cooled facility or a cutting-edge hydro-cooling setup, we deliver robust infrastructure in the UAE.

Process

Construction & Planning

Our meticulous planning ensures your project is delivered on time and within budget.

Site Selection & Feasibility
Site Selection & Feasibility

We identify optimal locations with access to reliable power grids and favorable environmental conditions.

Design & Engineering
Design & Engineering

Custom blueprints designed for maximum airflow, cooling efficiency, and space utilization.

Power Infrastructure
Power Infrastructure

Installation of transformers, switchgear, and backup systems to ensure 99.9% uptime.

Construction & Deployment
Construction & Deployment

Rapid build-out using prefabricated components and expert on-site teams.

Materials & Timeline

We use only industrial-grade materials designed to withstand the harsh operating conditions of high-density computing.

  • Fire-Resistant Panels: ISO-certified sandwich panels for thermal insulation and safety.
  • Heavy-Duty Racking: Custom steel racking systems capable of supporting heavy ASIC and GPU servers.
  • Completion Time: Standard projects are completed within 90-120 days from ground breaking.
Construction Materials

Featured Projects

Explore some of our successfully delivered turnkey data center facilities.

Liwa, Abu Dhabi

Liwa, Abu Dhabi

Premium facility in the heart of Abu Dhabi with high power capacity and robust infrastructure.

Power8 MW
Annual Rent550K USD / Year
Setup Cost3.1 Million USD
Contract10 Years (Extendable)
Hili, Abu Dhabi

Hili, Abu Dhabi

Efficient and secure data center location in Hili, offering a balance of performance and cost.

Power4.5 MW
Annual Rent950k USD / Year
Setup Cost1.57 Million USD
Contract5 Years (Extendable)
Texas, US

Texas, US

Large-scale facility in Texas with massive power capacity, ideal for major mining operations.

Power4 MW
Annual Rent720K USD / Year
Setup Cost3.8 Million USD
Contract4 Years (Extendable)

Investment

Approximate Costing

Transparent pricing models based on power capacity and cooling technology.

Air Cooled

Standard industrial design for maximum airflow.

$250k/ MW

  • Hot/Cold aisle containment
  • Industrial exhaust fans
  • Filtered intake system

Hydro Cooled

Advanced water cooling for high-density mining.

$450k/ MW

  • Closed-loop water towers
  • Higher efficiency & density
  • Reduced noise & dust

AI Data Center

Tier 3 standard facilities for HPC and AI workloads.

$1.2M/ MW

  • Redundant power (2N)
  • Precision cooling
  • Clean room environment
Datacenter Construction | Segments | Segments